Application Planning; Checking Incoming Goods; Checking The Delivery For Completeness And Correctness - Siemens SICHARGE UC Operating Instructions Manual

Table of Contents

Advertisement

Application planning

4.1

Checking incoming goods

4.1.1

Checking the delivery for completeness and correctness

When the carrier delivers the SICHARGE UC Dispenser, you should immediately perform in
incoming goods inspection.
Checking delivery
Start the incoming goods inspection with the following steps:
• Check the delivery for completeness.
• Check that the shipping documents match the items delivered.
Additional material
The following is transferred directly to the customer during the transfer process:
• Documents
• Password
NOTE
Disclaimer of liability
Customers are responsible for safekeeping of the documents and objects received. Siemens is
not obligated to reproduce transferred documents and objects.
Siemens is not liable for the improper use of intelligent devices, such as readers.
SICHARGE UC Dispenser
Operating Instructions, 06/2023, A5E50235695-AE
4
29

Advertisement

Table of Contents
loading

Table of Contents