Huawei UPS5000-E-200K-SM User Manual page 209

50 kva power modules
Hide thumbs Also See for UPS5000-E-200K-SM:
Table of Contents

Advertisement

UPS5000-E-(200 kVA-300 kVA)
User Manual (50 kVA Power Modules)
Product Component Checklist
No.
Check Item
1
Installation
2
Appearance of
the battery
rack or cabinet
3
Battery
appearance
4
Metal scrap
5
Ground cable
of the battery
rack or cabinet
Issue 17 (2023-07-10)
Acceptance Criteria
The equipment is installed
properly and arranged
neatly, and screws are
tightened.
No dust, rust, or
deformation exists.
● Batteries are clean and
free from stains.
● Battery wiring
terminals are intact.
● Batteries are intact and
free of damage,
deformation, bulges,
and cracks.
● Batteries have no acid
or electrolyte leakage.
(If electrolyte leakage
occurs, there will be a
pungent smell.)
There is no copper scrap
or other conductive
foreign matter.
The ground cable is
reliably connected to the
ground bar in the
equipment room, and the
screws are tightened.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Check Method and
Troubleshooting
● Check method: visual
inspection
● Troubleshooting:
Rectify the fault based
on the acceptance
criteria.
● Check method: visual
inspection
● Troubleshooting:
Rectify the fault based
on the acceptance
criteria.
● Check method: visual
inspection
● Troubleshooting:
Contact technical
support.
● Check method: visual
inspection
● Troubleshooting:
Rectify the fault based
on the acceptance
criteria.
● Check method: visual
inspection
● Troubleshooting:
Tighten the screws.
6 Routine Maintenance
Check
Interval
Monthly
Monthly
Monthly
Monthly
Yearly
201

Advertisement

Table of Contents
loading

Table of Contents