Huawei UPS5000-E-200K-SM User Manual page 176

50 kva power modules
Hide thumbs Also See for UPS5000-E-200K-SM:
Table of Contents

Advertisement

UPS5000-E-(200 kVA-300 kVA)
User Manual (50 kVA Power Modules)
Figure 3-128 Filling a gap with sealing putty
(1) Paper protective film
Step 3 Reinstall all covers.
Step 4 Close the cabinet doors.
Do not remove the dust cover during construction or before the device is powered
on. Remove the cover only when the device is ready for operation. Otherwise,
device faults may occur.
Figure 3-129 Dust cover
(1) Dust cover
----End
Issue 17 (2023-07-10)
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.
(2) Transparent film
3 Installation
(3) Sealing putty (with the
transparent film facing
upward)
168

Advertisement

Table of Contents
loading

Table of Contents