Finish — Indicates that the upgrade process is complete and allows you to save a copy of
the activity log to a file, start another upgrade, or exit the Active Upgrade Console.
Link:
− Remote Desktop
Allows you to establish a Remote Desktop Connection session to the Upgrade Side
while the system is split to perform upgrade tasks.
TIPS:
Starting and Exiting the Active Upgrade Console, page 5-126
Understanding the Active Upgrade Console Interface, page 5-104
Pre-Upgrade Tasks, page 5-96
Configuring the Active Upgrade Process, page 5-110
Main Window
The main window contains controls associated with the configuration and execution of the Active
Upgrade process.
During the configuration phase, main window allows you to specify settings for your system (see
the figure below), which you can save to a configuration file.
Main Window: Configuring the Active Upgrade Process
When you perform a readiness test and begin the upgrade process, the configuration settings in the
main window are replaced with an activity log (see the figure below) that allows you to track the
progress and success of the Active Upgrade process.