NEC Express5800 320Fd-MR User Manual page 169

Hide thumbs Also See for Express5800 320Fd-MR:
Table of Contents

Advertisement

Procedure in the ft server utility
Start
1.
Select the target component by using the ft server utility.
2.
Check the current state of the target component with the LEDs.
3.
Click the [Up] button of the target component.
A certain time is required for the start.
The start result can be verified by the LEDs on the target component. The result of the
start operation is registered in the syslog.
Stop
1.
Stop before replacing components.
2.
Select the target component by using the ft server utility.
3.
Check the current state of the target component with the LEDs.
4.
Click the [Down] button of the target component.
A certain time is required for the start.
The start result can be verified by the LEDs on the target component. The result of the
start operation is registered in the syslog.
Sample screen of ft server utility
Installing and Using Utilities 5-39

Advertisement

Table of Contents
loading

Table of Contents