Mitsubishi Electric Got 1000 Training Manual page 20

Graphic operation terminal
Hide thumbs Also See for Got 1000:
Table of Contents

Advertisement

(7) Applicable connections with third party PLCs
GOT can be connected to third party PLCs.
The system construction without regarding to PLC manufacture is available.
Refer to the product catalogue or manual about PLC models that can be
connected.
(8) Connection to equipment other than the PLC
● Microcomputer
● Bar-code reader
● Temperature controller, Inverter, Servo amplifier, CNC
(9) Multi-channel function
The GOT which installs multiple communication drivers can be monitored up to
maximum 4 (4 channels) controllers (PLC CPU, temperature controller, inverter,
etc.).
Install multiple
communication drivers.
Data can be read and written from a personal computer, microcomputer board,
PLC to GOT virtual devices.
The data read with the bar-code reader can be written to PLC CPU.
The controllers can be monitored and changed the parameters.
Channel No. 1
Bus connection
Channel No. 2
OMRON
PLC connection
Channel No. 3
Temperature
controller connection
Channel No. 4
Servo amplifier
connection
1 - 8
Monitor devices
for controllers

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents