Chapter 4 From GOT Screen Creation up to the Test
4.1 Preparation before using the GOT
The procedures up to monitor the PLC by the GOT is described in this section.
Install the GT Designer2 software package
1
(refer to the GT Designer2 Version2 Basic Operation/Data Transfer Manual).
2
Create project data (GT Designer2).
Create project (Refer to section 4.2.1).
(Setting GOT/PC (PLC) type to use)
Set controllers (Refer to section 4.2.2.)
2
(select connection method between GOT and PLC)
3
Screen switching device settings (Refer to section 4.2.3).
4
Create screen data for user (Refer to section 4.2.4)
3
Connect the PC and GOT (Refer to section 4.3.1)
USB cable
RS-232 Cable
Ethernet Cable
4
Transfer data to GOT
Install OS (standard monitor OS), PC communication drivers, etc.
(Refer to section 4.3.3)
2
Download project data (Refer to section 4.3.5)
5
Mount communication interface (Refer to section 4.4.1) *1
6
Connect GOT and PLC (Refer to section 4.4.2)
RS-232 Cable
RS-422 Cable
Bus connection cable
Optical fiber cable (MELSECNET/10)
Coaxial cable (MELSECNET/10)
CC-Link dedicated cable
10BASE-T/100BASE-TX cable
7
Communication check (refer to section 4.5).
8
Monitor start
* USB cables are used during training.
*1 This is not required when an RS-232 is used for connection.