Checking That Got Is Communicating Normally With The Plc; Checking The Os - Mitsubishi Electric Got 1000 Training Manual

Graphic operation terminal
Hide thumbs Also See for Got 1000:
Table of Contents

Advertisement

4.5 Checking that GOT is communicating normally with the PLC

4.5.1

Checking the OS

5)
6)
With the GT Designer2, check that the OS is properly installed on the GOT.
1)
Click on the [Communication] – [To/From
GOT] menu.
2)
When the Communicate with GOT dialog box
appears, click the [Drive Information] tab.
2)
3)
Select C: Built-in Flash Memory
4)
Click the Get Latest button.
3)
4)
5)
When the confirmation dialog box appears,
click the Yes button.
6)
The dialog box appears and a list of the items
installed on the drive is displayed as a tree.
When the following is confirmed, the OS is
properly installed on the GOT.
• Standard monitor OS
• Communication
Group
4 - 26
driver:
Bus
connection

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents