(4)
Connect the download jig with the jig connector (CN100) on the SYS board.
(5)
Turn ON the power.
Downloading starts automatically and the processing status is displayed on LCD screen.
June 2004 © TOSHIBA TEC
Connector
Fig.6-5
Fig.6-6
e-STUDIO200L/202L/230/232/280/282 FIRMWARE UPDATING
6 - 5
6