Heating Unit Confirmation - Hitachi IJ RX2 Service Manual

Hide thumbs Also See for IJ RX2:
Table of Contents

Advertisement

2.3.6 Heating unit confirmation

The operation confirmation of heating unit is performed.
Heating unit power ON/OFF.
A display of an ambient temperature and a heating unit temperature is performed.
Perform this operation confirmation in a state other than "Ready" state.
1 Press Adjustment/operational checkout on the maintenance menu.
If Adjustment/operational checkout is not displayed on the maintenance menu, set the
service personnel maintenance mode on the login user selection screen.
For information on changing to the service personnel maintenance mode,
refer to "2.1 Setting of service personnel maintenance mode."
The Adjustment/operational checkout screen is displayed.
Adjust./oper. checkout
Excitation
adjustment
Auto-phase gain
adjustment
[Stop
]
Charge voltage
Phase margin test
confirmation
Level sensor
Heating unit
confirmation
confirmation
Heating unit confirmation
2-17
Com=0
2015.07.07 12:45
Start
Manual
up
HOME
Back

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents