1.
PREPARATORY PROCEDURES FOR
MONITORING
The following shows the procedures to be taken before monitoring and corresponding reference sections.

Setting the communication interface

Determine the connection type and channel No. to be used, and
perform the communication setting.
Writing the project data and OS
Write the standard monitor OS, communication driver, extended
function OS, project data and communication settings onto the
GOT.
Verifying the project data and OS
Verify the standard monitor OS, communication driver,
extended function OS, project data and communication settings
are properly written onto the GOT.
Attaching the communication unit and
connecting the cable
Mount the optional equipment and prepare/connect the
connection cable according to the connection type.
Verifying GOT recognizes connected
equipment
Verify the GOT recognizes controllers on [Communication
Settings] of the Utility.
Verifying the GOT is monitoring normally
Verify the GOT is monitoring normally using Utility, Developer,
etc.
1 - 2
1. PREPARATORY PROCEDURES FOR MONITORING
1.1Setting the Communication Interface
Each chapter GOT Side Settings
1.2.1Writing the project data and OS onto the GOT
1.2.2Checking the project data and OS writing on GOT

1.3Option Devices for the Respective Connection

1.4Connection Cables for the Respective Connection
Each chapter System Configuration
Each chapter Connection Diagram
1.5Verifying GOT Recognizes Connected Equipment
1.6Checking for Normal Monitoring