Installing An Extension Or Trunk Blade; Installing The Blades; Order Of Installing Extension Blades - NEC Univerge SV8100 System Hardware Manual

Full-featured ip based communications system
Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 1.0
2.2
4 - 4

Installing an Extension or Trunk Blade

2.2.1

Installing the Blades

To install an extension/trunk blade with the system running:
1.
Insert the blade within the guide rail and push the blade
securely into position. Tighten the thumb screws on either side
of the blade.
2.
The Status LED starts flashing when the blade starts
processing (15 seconds).
Figure 4-2 Inserting Blades in the 19" CHS2U Chassis
2.2.2

Order of Installing Extension Blades

The order in which the station blades (CD-8DLCA, CD-16DLCA,
PZ-8DLCB and CD-4LCA, CD-8LCA, PZ-8LCE) are physically
inserted determines the numbering plan.
To avoid unexpected extension/trunk numbering if
the VoIP or Voice Mail blades register with the
system first, install these blades after the other
types of extension and trunk blades have been
installed.
For example, when a digital station blade (CD-16DLCA) is in Slot 1
(ext. 200~215) and three additional digital station blades are installed
in the following order, the numbering plan below in
Extension Blade Installation Order Example on page 4-5
UNIVERGE SV8100
Table 4-1
applies.
Installing the SV8100 Blades

Advertisement

Table of Contents
loading

Table of Contents