Figure 5-58 Ribbon Cable Installed
9.
Align the projections on the bottom of the 8LKD
(LD)-L UNIT into the guide holes on top of the
multiline terminal.
10.
Slide the 8LKD (LD)-L UNIT toward the keypad
buttons until snug (refer to
UNIT
Installed).
Figure 5-59 8LKD (LD)-L UNIT Installed