Figure 3-21 Install Additional CHS2U STAND KIT (EXT)
4.
Using supplied screws, secure the CHS2U STAND KIT to the
floor (refer to
Figure 3-21 Install Additional CHS2U STAND KIT
(EXT) on page
3-19).
5.
Connect the ground wire to all chassis. Refer to
19" Chassis Grounding on page 3-34
grounding the system.
6.
Refer to
2.5 Installing the 19" Chassis on page 3-22
installation of the chassis or, Chapter 5 paragraph
Installing an Extension or Trunk Blade on page 4-4
installation of blades.