Manual Instructions - Flow Path - GE AKTA avant User Manual

Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

9.8.2

Manual instructions - Flow path

The following table describes the flow path related manual instructions available for
ÄKTA avant.
Instruction name
Injection valve
Column position
Inlet A
Inlet B
pH valve
Sample inlet
Outlet valve
Loop valve
ÄKTA avant User Manual 29035184 AE
9.8.2 Manual instructions - Flow path
Description
Sets the Injection valve to the selected position. The in-
struction gives an injection mark in the chromatogram
when the inlet valve switches to Inject or Direct Inject.
Note:
Sample pump load flow refers to the flow that enters
the injection valve via SaP port.
Turns the Column valve to the position specified in the
parameter Position.
Turns Inlet valve A to the selected position.
Turns the Inlet valve B to the selected position.
Sets the pH cell and the 0.2 to MPa restrictor in positions
inline or offline.
The pH valve also has a calibration position. This position
is only available when performing calibration of the pH
monitor (In System control select System:Calibrate).The
calibration position can also be used to fill the pH cell
with storage solution since the pH valve is in open posi-
tion.
Note:
It is not possible to turn the pH valve during any type
of fractionation as it affects the delay volume.
The pH valve instruction can be given during the
delay volume of the different stop fractionation in-
structions, but it is executed only after the set delay
volume has been collected.
Turns the Sample inlet valve to the selected position.
Turns the Outlet valve to the selected position. The in-
struction gives a mark in the chromatogram when the
valve is switched to the selected position.
Turns the Loop valve to the selected position.
9 Reference information
9.8 Using Manual instructions
479

Advertisement

Table of Contents
loading

Table of Contents