15 Installing Cables

Table 15-6 Cable description

15.2.6 Cable Connections (-48 V DC, Three RRU3008s+Three
RRU3804s)
This section describes all the cable connections in a base station configured with three RRU3008s
and three RRU3804s in the -48 V DC power supply scenario.
Figure 15-7
15-16
Power cable
Jumper
NOTE
The E1/T1 cable or FE/GE cable is used according to on-site requirements.
shows the cable connections.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
CPRI optical
cable
PGND Cable
DBS3900(ICR)
Installation Guide
GPS clock
signal cable
E1/T1 cable
or FE/GE
cable