Figure 15-42 Gps Clock Signal Cable - Huawei DBS3900 Installation Manual

Indoor centralized rack (icr) dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

15 Installing Cables
Figure 15-42

Figure 15-42 GPS clock signal cable

(1) GPS clock signal cable
Step 2 Route cables by referring to
Step 3 Use cable ties to bind cables.
Step 4 Label the installed cables by referring to Attaching an L-Shaped Label.
----End
15-68
shows the installation of the GPS clock signal cable.
15.1 Cabling
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Requirements.
DBS3900(ICR)
Installation Guide
Issue 01 (2011-03-30)