Installing The E1/T1 Cable (Fe/Ge Cable Or Fe/Ge Optical Cable); Figure 15-33 Connections Of The Power Cable For The Ac Rru - Huawei DBS3900 Installation Manual

Indoor centralized rack (icr) dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900(ICR)
Installation Guide
----End
15.10 Installing the E1/T1 Cable (FE/GE Cable or FE/GE
Optical Cable)
This section describes the installation of the E1/T1 cable, FE/GE cable, and FE/GE optical cable.
The FE/GE cable and FE/GE optical cable are optional. The following description is based on
the installation of the E1/T1 cable.
Issue 01 (2011-03-30)

Figure 15-33 Connections of the power cable for the AC RRU

(1) Cable tie
3.
Route cables by referring to
4.
Use cable ties to bind cables.
5.
Label the installed cables by referring to Attaching a Sign Plate Label.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
15.1 Cabling
Requirements.
15 Installing Cables
15-59

Advertisement

Table of Contents
loading

Table of Contents