Cable Routes; Figure 15-24 Process Of Installing The Icr-Related Cables; Figure 15-25 Cable Routes - Huawei DBS3900 Installation Manual

Indoor centralized rack (icr) dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900(ICR)
Installation Guide

Figure 15-24 Process of installing the ICR-related cables

15.4 Cable Routes

This section describes the cable routes.
Figure 15-25
cable routes.
Issue 01 (2011-03-30)
shows the plan view of the cable rack. By studying the figure, you can know the
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
15 Installing Cables
15-47