15.6 Installing the Power Cable for the BBU

This section describes the installation of the power cable for the BBU.
Context
The cross-section area of the power cable for the BBU is 1.5 mm
Procedure
Step 1 Add an OT terminal to the power cable for the BBU. For details, see Assembling the OT Terminal
and the Power Cable.
15-50

Figure 15-27 Connections of the PGND cables for the AC RRU

4.
Route cables by referring to
5.
Use cable ties to bind cables.
6.
Label the installed cables by referring to Attaching a Sign Plate Label.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
15.1 Cabling
Requirements.
DBS3900(ICR)
Installation Guide
2
.
Issue 01 (2011-03-30)

Advertisement

Table of Contents
loading

Table of Contents