15 Installing Cables
Context
One end of the FE/GE cable is connected to the FE0 port on the WMPT/GTMU or FE/GE port
on the LMPT, and one end of the FE/GE optical cable is connected to the SFP port on the LMPT.
The cable route of the FE/GE cable or FE/GE optical cable is the same as that of E1/T1 cable.
Procedure
Step 1 Connect one end of the E1/T1 cable to the E1/T1 port on the WMPT or GTMU.
Step 2 Lead the other end out of the IMB03 from the top right, as shown in

Figure 15-34 Connections of the E1/T1 cable

Step 3 Route cables by referring to
15-60
15.1 Cabling
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Requirements.
DBS3900(ICR)
Installation Guide
Figure
15-34.