8 Installing the IFS06

8.1 Installing the IFS06 on the Concrete Floor

This section describes the procedure for installing the IFS06 on the concrete floor.
Procedure
Step 1 Place the marking template on the horizontal floor, and then use a marker to mark four anchor
points, as shown in

Figure 8-1 Marking anchor points

(1) Wall
Step 2 Drill holes at the anchor points and install the expansion bolt assemblies.
1.
8-2
Figure
8-1.
Use a hammer drill with bit 16 to drill holes at the marked anchor points. Ensure that the
depth of each hole ranges from 52 mm to 60 mm, as shown in
Use a vacuum cleaner to clear the dust inside and around the holes. If the inter-hole spacing
is too wide or too narrow, locate and drill holes again.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
(2) Front
DBS3900(ICR)
Installation Guide
(3) Left
Figure
8-2.
Issue 01 (2011-03-30)

Advertisement

Table of Contents
loading

Table of Contents