Huawei LampSite Installation Manual page 42

Hide thumbs Also See for LampSite:
Table of Contents

Advertisement

LampSite
Installation Guide
Procedure
Step 1 Install an optical module, as shown in
1.
2.
3.
4.
5.
Figure 4-33 Removing the dust-proof cap from a port
Figure 4-34 Installing an optical module
Step 2 Install a CPRI optical cable, as shown in
1.
2.
Table 4-3 CPRI optical cable connections
One End
Connect
or
DLC
connecto
r
Issue 02 (2014-05-27)
Remove the dust-proof cap from the CPRI port on the RHUB panel.
Remove the dust-proof cap on the optical module.
Lower the puller of the optical module.
Insert the optical module into the CPRI port on the RHUB, BBU or ODF.
Raise the puller of the optical module.
Remove the dust-proof cap from the optical cable connector.
Install the optical cables by referring to
Connected to
BBU/
LBBP&WBBP&UBBP/
CPRI port
CPRI0 or CPRI1 port on the
RHUB
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure 4-33
and
Figure
Figure
4-35.
Table
4-3.
The Other End
Connector
DLC connector
4 Installing an RHUB
4-34.
Connected to
CPRI0 or CPRI1 port on
the RHUB
CPRI0 or CPRI1 port on
the RHUB
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents