Checking The Rhub Hardware Installation - Huawei LampSite Installation Manual

Hide thumbs Also See for LampSite:
Table of Contents

Advertisement

LampSite
Installation Guide
Figure 4-37 Installing an RHUB power cable
----End

4.5 Checking the RHUB Hardware Installation

After an RHUB is installed, check the installation of hardware including the devices and related
cables.
Table 4-4
Table 4-4 Hardware installation checking list
No.
1
2
3
Table 4-5
Table 4-5 Checklist for power cable and PGND cable connections
No.
1
Issue 02 (2014-05-27)
lists the hardware installation checking items.
Item
The position for each device conforms to the engineering design and meets the
space requirement.
Ensure that the RHUB is properly installed.
The surface of the RHUB is neat and clean. The external paint is intact. The labels,
tags, and nameplates are correct, legible, and complete.
lists the checking list of the power cable and PGND cable connections.
Item
The power cables and PGND cables comply with the requirements of local
regulations.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Installing an RHUB