Requirements For Installation Personnel - Huawei LampSite Installation Manual

Hide thumbs Also See for LampSite:
Table of Contents

Advertisement

LampSite
Installation Guide
Multimeter
Ladder

2.3 Requirements for Installation Personnel

This section describes requirements for installation engineers. They must be qualified and
trained, and familiar with correct operation methods and safety precautions before performing
any operations.
Before the installation, pay attention to the following items:
l
l
Issue 02 (2014-05-27)
Technical engineers must take Huawei training and be familiar with proper installation and
operation methods.
The number of installation personnel depends on the engineering schedule and installation
environment. Generally, three to five persons are required. Generally, only three to five
onsite personnel are necessary.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Network cable tester
Torque wrench for SMA
connector
2 Installation Preparations
Vacuum cleaner
Socket wrench (M6)
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents