Checking After Connection - Fujitsu ETERNUS DX60 S4 Configuration Manual

Hybrid storage systems / disk storage systems / all-flash arrays, eternus dx s4 series, eternus dx s3 series. eternus af series
Hide thumbs Also See for ETERNUS DX60 S4:
Table of Contents

Advertisement

Chapter 4 Connection and Settings

4.6 Checking after Connection

4.6
Checking after Connection
After connecting all the devices, check that the POWER LED on the power synchronized unit is green or
blinking green. Perform a test to check that the ETERNUS DX/AF turns on/off with the server as necessary.
Check the following operations when performing a test.
For details about LEDs and the status of power synchronized units that are on, refer to
meanings of each LED (for power synchronized units)" (page
If a power synchronized unit is not operating properly, refer to
(1) Check the connection status
Turn on/off each server, and check that the linked ETERNUS DX/AF also turns on/off.
(2) Check scheduled operations and power outage settings
Check that the ETERNUS DX/AF turns on/off in accordance with the linked server for the scheduled
operations and the power outage settings.
-
Power on by scheduled operations
Check that the ETERNUS DX/AF turns on in accordance with the linked server for the scheduled
operations.
-
Power off by scheduled operations
Check that the ETERNUS DX/AF turns off after all of the linked servers are turned off by a scheduled
operation.
-
Power off due to power outages
Simulate a power outage and check that the ETERNUS DX/AF turns off after all of the linked servers are
turned off according to the power outage settings.
-
Power on after power recovery
Simulate power recovery and check that the ETERNUS DX/AF turns on in accordance with the linked
server by the power recovery settings.
For the status of power on/off requests from a power synchronized unit to an ETERNUS DX/AF, check the
POWER SENSOR LED on the power synchronized unit.
On
The ETERNUS DX/AF is requested to be turned on after detecting AC output from a server UPS unit.
Off
The ETERNUS DX/AF is requested to be turned off after detecting no AC output from all of the server UPS
units.
FUJITSU Storage ETERNUS DX, ETERNUS AF Configuration Guide (Power Synchronized Unit)
25).
"6.3 Troubleshooting" (page
64
Copyright 2017 FUJITSU LIMITED
"Table 1.2 Status and
73).
P3AM-8012-10ENZ0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents