ABB RELION 670 Series Installation Manual page 81

Hide thumbs Also See for RELION 670 Series:
Table of Contents

Advertisement

1MRK 514 026-UEN B
670 series 2.2 IEC
Installation manual
Cc
1
2
3
4
5
6
X1
IED
4)
IEC07000141 V2 EN-US
Figure 45:
Communication cable installation, 2-wire
Where:
1
The inner shields shall be connected together (with an isolated terminal block) and only
have one connection point in the whole system, preferably at the external equipment (PC).
The outer shield shall be connected to the IED chassis in every cable end. Use the shield
connection clamp at all IEDs. The first IED will have only one cable end but all others require
two.
2
Connect according to installation instructions for the actual equipment, observe the 120
ohms termination.
3
Connect the screens according to the installation instructions for the actual equipment.
4
Shield connection clamp, see Figure 30.
Cc
Communication cable
Cc
1)
1
2
3
4
5
6
X1
IED
4)
Section 6
Connecting
2)
External
Equipment (PC)
3)
IEC13000229-1-en.vsd
PE 1) 3)
75

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reb670Rec670Res670Ret670Reg670Red670 ... Show all

Table of Contents