Connect the cable lugs to the pedestal:
1. If the lead-through plate is fixed to the floor, undo the fixing screws.
2. Place the pedestal onto the lead-through plate.
3. Fasten the pedestal and the lead-through plate to the floor with the screws through the same holes.
4. Connect the cable lugs to the pedestal (U1, V1, W1, U2, V2, W2 and PE; optional brake resistor
cable lugs to UDC+/R+ and R-).
5. Tighten the connections.
6. Units with EMC screen (+E202): Fasten the EMC screen between the input and motor cables as
shown on page 61.
Frame sizes R7 and R8: M12 (1/2 in.) bolt
Tightening torque: 50...75 Nm (37...55 lbf ft)
PE
Wheel the drive frame back on the pedestal (See step Remove the pedestal).
Installation
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
View of frame size R7 without EMC screen (+E202)
4
View of frame size R7 with EMC screen (+E202)
W2
V2
U2
R-
W1
V1
U1
WARNING! It is not allowed to connect the cables directly to the drive module terminals.
The leadthrough insulation material is not strong enough to carry the mechanical stress
exerted by the cables. The cable connections must be performed in the pedestal.
UDC+
R+
UDC-