Installation; Overview; Unpacking And Inspection; Pipe Saddle Mount Installation - ABB XSeriesG4 User Manual

Hide thumbs Also See for XSeriesG4:
Table of Contents

Advertisement

2

Installation

Overview

This section provides the information for installation and setup. For safe and trouble-free installation, follow all instructions and
advisories. Due to its unique configuration, the XRC
together near the end of this section.
To plan the installation, read through this section before beginning the installation. Also before beginning, refer to the wiring
diagrams delivered with the new XRC
Installation procedures presented within this section are applicable to all XRC

Unpacking and inspection

Unpacking
G4
The XRC
is shipped in a specially designed shipping carton which contains the unit, mounting brackets, parts list and wiring
and interconnect diagrams. The solar panel, mounting brackets and the battery pack with applicable hardware are shipped in a
separate carton.
Carefully remove the items from each carton.
Inspection
Inspect the shipping carton for any damage. If the shipping carton is damaged, keep it until the contents have been
inspected for damage.
Inspect the unit exterior for dents, chipped paint, etc.
Inspect the LCD window for breakage.
Open the housing by first removing the bolt and releasing the latch or latches.
Visually inspect the Digital PC board, cables and connectors for damage.
Damaged components
If any components have been damaged or if there are noticeable defects, notify a Totalflow representative. Keep all shipping
materials for the carrier's inspection. Totalflow will arrange for immediate repair or replacement; go to section 5.5, Getting
technical support help.

Pipe saddle mount installation

Use this procedure to install the unit directly to the meter run. Before beginning, review the procedure and the materials required
for installation.
Materials supplied
G4
XRC
mounting bracket and hardware
Customer-supplied materials
Optional equipment may be provided by the customer or ordered from Totalflow:
One pipe saddle
One 2" pipe of suitable length
Step-by-step instructions
1)
Position the pipe saddle on meter run (see Figure 26). Select a location that allows easy user access and is close to
equipment.
G4
6990 installation instructions, and its optional equipment, are grouped
G4
. These may be stored in the back of this manual under the tab: Wiring Diagrams.
26
G4
models.