Figure 2-12 Fixing The Chassis - NEC SL2100 Hardware Manual

Hide thumbs Also See for SL2100:
Table of Contents

Advertisement

SL2100
4.
Tighten the other screw at the lower left after slide the chassis into the wall.
1.5.3 Wall Mounting the Chassis and the Backup Battery (IP4WW-Battery Box)
For the details of IP4WW Battery Box installation, refer to
BATTERY on page
2-22.
Vertical Arrangement of Chassis and Battery Boxes
For Wall Mounting the Chassis and the IP4WW-Battery Box, refer to
of Chassis and Battery Boxes on page
Due to the limit of extension cable length to connect Main Chassis and Expansion Chassis, the install
location of Main Chassis and each Expansion Chassis must be considered as
Arrangement of Chassis and Battery Boxes on page
2-10
Fasten screw

Figure 2-12 Fixing the Chassis

2-11.
INSTALLING THE EXTERNAL BACKUP
Figure 2-13 Vertical Arrangement
Figure 2-13 Vertical
2-11.
ISSUE 1.0
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents