Figure 2-13 Vertical Arrangement Of Chassis And Battery Boxes; Figure 2-14 Horizontal Arrangement Of Chassis And Battery Boxes - NEC SL2100 Hardware Manual

Hide thumbs Also See for SL2100:
Table of Contents

Advertisement

ISSUE 1.0
IP4WW-Battery Box

Figure 2-13 Vertical Arrangement of Chassis and Battery Boxes

Horizontal Arrangement of Chassis and Battery Boxes
For Wall Mounting the Chassis and Floor Mounting the IP4WW-Battery Box, refer to
Figure 2-14 Horizontal Arrangement of Chassis and Battery Boxes on page
Due to the limit of extension cable length to connect Main Chassis and Expansion Chassis, the install
location of Main Chassis and each Expansion Chassis must be considered as above or as
Figure 2-14 Horizontal Arrangement of Chassis and Battery Boxes on page
Hardware Manual
Expansion Chassis 1
Minimum
300 mm
(11.81")
Main Chassis
Expansion Chassis 2
SL2100
Minimum
200 mm
(7.874")
Minimum
200 mm
(7.874")
2-12.
2-12.
2-11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents