3 SYSTEM SHUT DOWN
ECTION
3.1 Powering Off the System
1.
Turn the all Chassis power off using the power switch.
• If Expansion Chassis are installed, turn the power on/off in the order of
Expansion 2 Chassis, Expansion 1 Chassis and then Main Chassis.
• DO NOT power off by disconnecting the AC (or DC for battery backup)
power. Always use the Power Switch on the Main/Expansion Chassis.
• All calls in progress will be cut off when the system is powered off, or if
the Power Failure occurred.
• All user's setting (such as Call Forward, Camp-On, etc) will be kept.
3.2 Resetting the System
The system reset is carried out using the "Power OFF and ON" operation.