Siemens SIPROTEC 5 Operation Manual page 27

V7.30 and higher
Hide thumbs Also See for SIPROTEC 5:
Table of Contents

Advertisement

Fit the device back onto the wall without fastened on-site operation panels.
²
Use the supplied grounding cable to connect the expansion module with the device and reconnect the
²
device to service ground.
Fasten the connecting cable for the on-site operation panel on the extreme left-hand operation panel of
²
those on-site operation panels assembled beforehand into a block.
Place the block of assembled operation panels on the distance frames of the device. In doing so, guide
²
the connecting cable for the on-site operation panel through the cut-outs of the distance frame to the
terminal of the basic module.
Fasten the connecting cable for the on-site operation panel to the basic module.
²
Bolt the operation panels to the distance frames and firmly tighten the screws.
²
Tighten all loose screws on the contact tabs and on the mounting brackets.
²
Reinstall all plastic screw covers.
²
Extend the device configuration in DIGSI and load this configuration to the device.
²
Resume operation of the device.
²
SIPROTEC 5, Operation, Manual
C53000-G5040-C003-7, Edition 06.2016
2.2 Surface-Mounting Devices with Integrated On-Site Operation Panel
Expanding Devices
27

Advertisement

Table of Contents
loading

Table of Contents