ACH580 E-Clipse bypass and packaged drive user manual
The following is a typical power diagram.
Disconnect Switch
or Circuit Breaker
3 Phase
Input Power
Service Switch
(Optional)

Installation flow chart

The installation of E-Clipse Bypass Configurations for ACH580 drives follows the
outline below. The steps must be carried out in the order shown. At the right of each
step are references to the detailed information needed for the correct installation of
the unit.
PREPARE for installation
PREPARE the mounting
location
MOUNT the unit
REMOVE the covers
from Vertical E-Clipse
Bypass Unit
INSTALL wiring
CHECK jumpers and
switches
CHECK installation
RE-INSTALL the covers
APPLY power
START-UP
For more details, refer to the ACH580-01 Hardware Manual (3AXD50000044839).
Drive with E-Clipse Bypass
3
Drive Input Fuse
Reference in ACH580-01
Task
(3AXD50000044839)
Preparing for installation in
the ACH580-01 Hardware
Manual (3AXD50000044839)
PREPARE the mounting
location
MOUNT the drive
REMOVE the front cover
Wiring overview and Install
the wiring
Check installation
Re-install cover
Apply power
Start-up
Bypass
Control
ACH580
Drive
Hardware Manual
Installation section
Drive Output
Contactor
Motor
3
Bypass
Contactor
Reference in this Manual
Preparing for installation
on page 6.
Suitable mounting location
Installing the wiring
starting on
page 7.
Check jumpers and switches
page 25.
Check installation – Bypass
page 19.