Control Panel - ABB ACH580 Series User Manual

E-clipse bypass and packaged drive
Table of Contents

Advertisement

8
• Use wire ties to permanently affix control/communications wiring to the hooked
wire race tie points provided maintaining a minimum 6 mm (1/4 in.) spacing from
power wiring.
• Use a separate motor conduit run for each motor.
Wiring overview
Connection and wiring diagrams – Vertical E-Clipse Bypass
ACH580 Vertical E-Clipse Bypass units are configured for wiring access from the
bottom only. The following figures show the layout and wiring connection points. For
drive control wiring, see page 52. Maintain appropriate separation of control and
power wires.
ACH580 Drive
E-Clipse Bypass
Control Board
Terminals (X2)
Fuses
Service Switch
(Optional)
Disconnect Switch
or Circuit Breaker
Input
Terminals
Installation
ACH580 E-Clipse bypass and packaged drive user manual
Drive Control Panel
E-Clipse Bypass

Control Panel

Motor
Terminals
Motor Ground
Lug
Input
Ground Lug
V1/V2
(Vx1-1, Vx1-2)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents