Installing The Power Harness - Toro ProPass 200 Operator's Manual

Top dresser
Hide thumbs Also See for ProPass 200:
Table of Contents

Advertisement

Figure 6
1. Packing studs and foam
6. Install the hopper guard using the supplied button head
bolts (1/4 x 5/8 inch) and nylon locknuts
Figure 7
1. Hopper front guard
(Figure
7).
2. Bolts
2

Installing the Power Harness

Parts needed for this procedure:
1
Power harness
1
Socket bracket
1
Socket bracket, heavy
2
Carriage screw
2
Flange nut
2
Screw
2
Flange nut
Procedure
The tow vehicle power harness provides the electrical power
required by the control systems of the machine. Install
this harness on the vehicle you plan to use to operate the
machine. If you will use more than one vehicle with the
machine, purchase additional power harnesses from your
Toro distributor.
The power harness is primarily designed to be installed on a
Toro Workman vehicle, however, you can also install it on
many other tow-vehicles.
1. Mount the socket bracket to a fixed point at the rear of
the tow vehicle using one of the mounting brackets
provided
(Figure
Note: Ensure that the bracket will not come in contact
with anything if the tow vehicle is equipped with a
dump box.
Important: Ensure that none of the wiring is
loose or in the way of any mechanical components.
11
8).

Advertisement

Table of Contents
loading

This manual is also suitable for:

4470144751

Table of Contents