NEC iPasolink 200 Manual page 103

Hide thumbs Also See for iPasolink 200:
Table of Contents

Advertisement

CABLE TERMINATION
Procedure 6-3
Outlines of parts
Cable jacket
Braided wire
Tools
1
Insertion of parts, remove of jacket of cable.
(1) The clamp nut is inserted as shown.
(2)
Note
Tools
Installation
Submission Prohibited
NEC Internal Use Only
TNC-P Connector used for IDU IF IN/OUT
(L-angle:TNC156(R0))
[Applicable cable: 5D-FB-E]
Aluminum tape
Center conductor
Insulator
knife, cutter, nipper, tweezers, file, measure,
clearance gauge, etc.
spanner, torque spanner 12 mm, 16 mm
Remove 8 mm +1 of jacket only.
Cable
Clamp nut
Do not damage the braided wire.
knife
cutter
measure, etc.
Connector body
Clamp
*Cut the jacket edge squarely.
(8 mm +1)
6-15
Clamp nut
NWD-107460-02E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents