NEC iPasolink 200 Manual page 123

Hide thumbs Also See for iPasolink 200:
Table of Contents

Advertisement

CABLE TERMINATION
2
Insertion of parts.
(1) The clamp are inserted in the cable.
(2) The braided wire is expanded a little. The cord tube is inserted between the
Tool
3
Center conductor, braided wire and insulator processing.
(1) After cord tube insertion, an aluminum tape and the insulator are cut along an
(2) Turning back the braided wire in the clamp.
(3) A central conductor is 6 to 7 mm from an end face. Cut it to become 6 to 7 mm
(4) A point of a central conductor is chamfered.
Tools
Installation
Submission Prohibited
NEC Internal Use Only
aluminum tape and the braided wire.
Refer to the position of the cord tube by step 3.
Clamp
Braided wire
tweezers
end face.
when there are 7 mm or more.
Flange of clamp
Cord tube
cutter
nipper
file
Aluminum tape
cord tube
(2 mm)
End face
Chamfering
6 - 7 mm
6-35
NWD-107460-02E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents