Huawei PDU8000 User Manual page 41

Modular precision power distribution cabinet
Hide thumbs Also See for PDU8000:
Table of Contents

Advertisement

PDU8000 Modular Precision Power Distribution Cabinet
User Manual
Figure 4-18 Removing the transparent cover of the N bar
Figure 4-19 Removing the transparent cover of the input copper bar
Step 2 Connect one end of the ground cable to the ground bar inside the PDC, and connect the other
end of the cable to the ground grid or busbar of the equipment room, as shown in
1.
2.
Issue 01 (2016-02-27)
Lay out the ground cable based on the position of the ground grid or busbar and the
onsite cabling mode.
Secure both ends of the ground cable to a torque of 17–20 N· m.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Installation Guide
Figure
4-20.
35