Installing The Pdc - Huawei PDU8000 User Manual

Modular precision power distribution cabinet
Hide thumbs Also See for PDU8000:
Table of Contents

Advertisement

PDU8000 Modular Precision Power Distribution Cabinet
User Manual
Figure 4-1 Removing the bolts and pallet
Step 7 (Optional) Adjust the PDC anchor bolts to ensure that castors touch the floor, and push the
PDC to a place near the installation position.
----End

4.4 Installing the PDC

Prerequisites
Context
Issue 01 (2016-02-27)
The PDC weighs about 350 kg. Take protective measures during movement to prevent
personal injury.
Move the cabinet with caution to avoid bumping or toppling, which may damage the
equipment.
The installation environment has been checked with expected results.
The site has been closed off, and notices have been posted.
The PDC has been unpacked and inspected, and no problems were found.
Common tools such as the right angle, measuring tape, level, adjustable wrench, and
marker are available.
A modular precision PDC can be installed on a concrete floor or an ESD floor.
A modular precision PDC can be deployed separately or combined with another cabinet.
As the onsite conditions may vary, the following steps are for reference only. Onsite installation
personnel and technical engineers can decide whether to perform the steps based on the actual situation.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Installation Guide
23

Advertisement

Table of Contents
loading

Table of Contents