Toro Workman GTX Electric & Lithium Service Manual page 142

Table of Contents

Advertisement

3. Install both rear wheel hubs and wheels to the vehi-
cle (see Rear Wheel and Hubs in the Service and Re-
pairs section of Chapter 5 -- Chassis). Make sure that
fasteners for wheel hubs, brake calipers and wheels are
properly torqued during assembly.
4. Lower vehicle to ground.
5. Apply antiseize lubricant to the splines of the trans-
axle and motor shafts.
6. Install traction motor to transaxle (see Traction Motor
in the Service and Repairs section of Chapter 3 -- Electri-
cal System).
7. Make sure that transaxle is filled with 0.7 quarts (0.66
liters) of new SAE 10W--30 motor oil.
Transaxle
8. Install cargo bed to the frame (see Cargo Bed in the
Service and Repairs section of Chapter 5 -- Chassis).
9. Connect the conductors between the battery pack
and vehicle components (see Opening Battery Circuit in
the General Information section of Chapter 3 -- Electrical
System). Make sure to torque hex nuts on battery termi-
nals from 95 to 105 in- -lb (10.8 to 11.8 N- -m).
10.After connections are made, apply Toro battery ter-
minal protector (see Special Tools) to all battery posts
and cable connectors on traction motor to prevent corro-
sion. Make sure that cable terminal boots are positioned
over all connections.
11. Check brakes for proper operation.
Page 4 - - 6
Workman GTX Electric

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents