Fuse Testing
CAUTION
When testing fuses for continuity with a multime-
ter (ohms setting), make sure that fuse is re-
moved from circuit.
IMPORTANT:
Before removing fuse from con-
troller (425 Amp) for testing, open the battery circuit
by removing one of the battery cables (see Opening
Battery Circuit in the General Information section of
this chapter).
Make sure key switch is turned OFF. Remove fuse to
check continuity. The test meter should read less than
1 ohm if a fuse is functional. Replace the fuse if faulty.
If fuse was removed from controller, torque the nuts that
secure the fuse from 89 to 106 in- -lb (10 to 12 N- -m).
Workman GTX Electric Lithium
1
2
1. Controller
2. Fuse (425 A)
3. Screw (2 used)
Page 3B - - 25
3
4
5
89 to 106 in- -lb
(10 to 12 N- -m)
Figure 21
4. Lock washer (2 used)
5. Flat washer (2 used)
Electrical System