5.6 Commissioning CIMs and BIMs

If CIMs and battery interface modules (BIMs) are installed, perform the following steps to
commission.
Procedure
Step 1 Log in to the ECC800 WebUI as an administrator.
Step 2 Choose Monitoring > Power Distribution > CIM > Running Parameters.
Step 3 Set CIM single battery qty., Batt installation time, Battery string capacity, Current
source, and Battery string No.. Retain default values for other parameters.
Table 5-43 Setting CIM parameters
Parameters
CIM single
battery qty.
Batt installation
time
Battery string
capacity
Current source
Battery string No.
Step 4 Set the wireless networking (802.15.4) function of CIMs and BIMs.
Issue 07 (2020-03-16)
Description
Total number of batteries monitored by
the CIM.
Actual time at which batteries are
installed.
If the CIM manages a single battery
string, set this parameter to the
capacity of a single battery.
If the CIM manages multiple battery
strings, set this parameter to the
capacity of a single battery
multiplied by the number of battery
strings.
Select a Hall effect sensor (0-xxx A).
The actual specifications of the Hall
effect sensor will apply.
Set this parameter based on the planned
codes for CIMs and battery strings.
If multiple CIMs are connected, commission one CIM first and then commission the
other CIMs in the same way.
Before networking, ensure that all the CIMs and BIMs have no network parameters, that
is, the RF_Z indicator on the CIM is steady green and the RUN/ALM indicator on the
BIM is steady red.
If the RF_Z indicator on the CIM is not steady on (green), press and hold down the
networking switch on the CIM for 10–20 seconds to clear the original network.
If the RUN/ALM indicator on the BIM is not steady red, hold down the BIM
networking switch for at least 5 seconds to clear the original network.
Copyright © Huawei Technologies Co., Ltd.
5 Power-On Commissioning
Remarks
Set according to the
battery parameters planned
by the customer.
N/A
Obtain the battery capacity
from the battery label or
document.
N/A
Set according to the
customer plan.