Huawei ECC800 User Manual page 97

Data center controller
Hide thumbs Also See for ECC800:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual
Table 5-2 Setting a device address
Device
Toggle
Address
Switch 1
1
OFF
2
ON
3
OFF
4
ON
Step 2 Add a UPS2000-G.
1.
2.
Table 5-3 Adding a UPS2000-G
Path
Choose System Settings >
Device Management and
click Add Device. The
parameters for adding
devices are displayed.
3.
Issue 07 (2020-03-16)
Toggle
Toggle
Switch 2
Switch 3
ON
ON
OFF
ON
OFF
ON
ON
OFF
Log in to the ECC800 WebUI as an administrator.
Add a UPS2000-G.
Click Test Connect to check whether the UPS2000-G connects to the ECC800 properly.
If the UPS2000-G connects to the ECC800 properly, click Confirm. The connected
devices are displayed in the Number of connected devices list.
If the UPS2000-G does not connect to the ECC800 properly, check whether the
cable between the UPS2000-G and the ECC800 is connected properly, whether the
Copyright © Huawei Technologies Co., Ltd.
Toggle
Toggle
Switch 4
Switch 5
ON
ON
ON
ON
ON
ON
ON
ON
Parameter Name
Device attribute
Device Type
Connect To
Communications Port
Device Address
5 Power-On Commissioning
Toggle
Toggle
Switch 6
Switch 7
ON
ON
ON
ON
ON
ON
ON
ON
Setting
Select UPS from the drop-down
list box.
Select UPS2000G-A from the
drop-down list box.
Select ECC800 from the
drop-down list box.
Select COM2 from the
drop-down list box.
NOTE
The setting example indicates that the
UPS2000-G is connected to the
COM2 port on the ECC800. If the
UPS2000-G is connected to another
port, enter the number of the
connected port.
In this example, Device Address
is set to 1. During actual
configuration, set the device
address for the UPS2000-G based
on the actual situation.
Toggle
Switch 8
ON
ON
ON
ON
88

Advertisement

Table of Contents
loading

Table of Contents