Huawei FusionDC1000A Installation Manual page 28

Prefabricated all-in-one data center
Hide thumbs Also See for FusionDC1000A:
Table of Contents

Advertisement

FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
Figure 2-5 Pipe anti-freezing solution
(1) Trap
(3) Water refill pipe
(5) Soil
● Prepare traps for pre-fab. module drainpipes.
● The ends of the drainpipes should be connected to the utility drainpipes.
Figure 2-6 Requirements for wrapping the electric heating belt
● The electric heating belt needs to be wrapped around the drainpipe and water
refill pipe evenly during onsite installation.
● Wrap the electric heating belt before wrapping the thermal insulation foam.
Ensure that the thermal insulation foam covers the electric heating belt. The
thermal insulation foam must be able to withstand a temperature higher than
200°C.
Issue 01 (2021-04-20)
NO TICE
NO TICE
Copyright © Huawei Technologies Co., Ltd.
(2) Electric heating belt
(4) Drainpipe