FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
Figure 4-16 Installing a ground lug
In addition to using ground lugs, you can also connect ground cables to pre-fab. module ground
points using M12x30 stainless steel bolt assemblies, as shown in the following figure. Ground
cables can be routed through plastic-coated metal hoses for protection based on site
requirements.
Figure 4-17 Installing a ground cable
----End
Issue 01 (2021-04-20)