Huawei FusionDC1000A Installation Manual page 34

Prefabricated all-in-one data center
Hide thumbs Also See for FusionDC1000A:
Table of Contents

Advertisement

FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
Table 3-2 Materials recommended for local purchase
Name
(Optional)
Silicone
sealant
(Optional)
Glue gun
Hacksaw
Water refill
or
condensate
pipe
Pipe thermal
insulation
Pipe
fastener
Cable tie
Power cable
Insulation
tape
Terminal
Ground
cable
terminal
Issue 01 (2021-04-20)
Model/Function
Installs awnings.
Applies glue during awning installation.
Cuts PPR pipes.
DN25-PP-R, including the straight section, elbow,
and straight-through connector
10 mm thick thermal insulation foam, such as
rubber-plastic foam and glass wool
Supports pipes.
Binds and secures cables onsite.
● Electronic|Electric Cable, 600 V/1000 V, ZA-YJV,
(4 x 120 + 1 x 70)mm
Yellow, Green, Red, Blue, Black), 322 A, CE
● Connects mains input power cables.
Insulates cables onsite.
● Bare crimping terminal, DT, 120 mm
380 A, tin plating
● Connects mains input power cables.
● Bare crimping terminal, DT, 70 mm
260 A, tin plating
● Connects mains input power cables.
● Bare crimping terminal, DT, 95 mm
plating
● Electronic|Electric Cable, 450 V/750 V, 60227
IEC 02 (RV), 95 mm
CCC, CE
Copyright © Huawei Technologies Co., Ltd.
3 Installation Preparations
2
, Black (4+1 Cores:
2
, M12,
2
, M12,
2
, M12, tin
2
,Yellow/Green, 258 A,
Quantity
1 bottle
1 PCS
1 PCS
Depending
on the actual
pipe route
Depending
on the actual
pipe route
Depending
on the actual
pipe route
1 package,
200 to 300
PCS
Depending
on site
requirements
1 roll
18 PCS
5 PCS
Configure 1
PCS for each
ground point.
27