FusionDC1000A Prefabricated All-in-One Data
Center
Installation Guide (IT Scenario)
Figure 7-6 Installation positions of transport fasteners on the top of the UPS
cabinet and SmartLi
(1) SmartLi
(3) Transport fastener
Procedure
Step 1 Remove the transport fasteners on the top of IT cabinets and smart cooling
products.
1.
Issue 01 (2021-04-20)
Remove the rubber plugs using a screwdriver and remove the side panels for
sealing plates.
Copyright © Huawei Technologies Co., Ltd.
7 Removing Transport Protection Materials
(2) UPS cabinet
64