Preparing the operating shaft for the feeder earthing switch
Make sure that the coupling pin of the operating shaft for the feeder earthing switch at the
withdrawable circuit-breaker and the coupling in the switching-device compartment are in
vertical position.
Fig. 107: Coupling pin of the operating shaft
If required, put the coupling pin of the feeder earthing switch operating shaft in vertical
position using the operating lever.
Fig. 109: Operating the feeder earthing switch operating shaft
Interlocking the service truck with the withdrawable circuit-breaker at the panel
139-2021.9 / 07
for the feeder earthing switch
CAUTION
Maloperation
Interlocks placed at the panel front prevent being injured when moving the
withdrawable circuit-breaker into the panel.
Make sure the service truck is interlocked with the panel before moving
the withdrawable circuit-breaker into the panel.
Observe the notes and the operating instructions on the service truck.
Operating the circuit-breaker panel
Fig. 108 Coupling of the feeder
NXAIR M
earthing switch in the
switching-device
compartment
67