Operating The Circuit-Breaker Panel; Control Elements At The Front Side Of The Panel - Siemens NXAIR M Operating Instructions Manual

Air-insulated switchgear
Table of Contents

Advertisement

10 Operating the circuit-breaker panel

10.1 Control elements at the front side of the panel

Fig. 33: Control elements on the panel front
139-2021.9 / 07
Operating the circuit-breaker panel
HINT
Read and understand these instructions before attempting operating works.
(1)
Door to the low-voltage compartment
(2)
Protection device
Locking device for the door to the low-voltage
(3)
compartment
Test sockets for voltage detecting system
(4)
(type LRM)
Instruction label for closing the
(5)
high-voltage door
(6)
High-voltage door
Opening for charging the spring in the circuit-
(7)
breaker manually (covered)
(8)
Handle for opening the high-voltage door
Control gate for opening and closing the
(9)
actuating opening for racking the switching
device
Actuating opening for racking the switching
(10)
device
Actuating opening for inserting the double-bit
(11)
key to control racking of the withdrawable part
Mechanical position indicator for withdrawable
(12)
part
(13)
Actuating opening for feeder earthing switch
Operating slide for opening and closing the
(14)
actuating opening for operating the feeder
earthing switch
Mechanical position indicator for feeder
(15)
earthing switch
(16)
Operations counter for circuit-breaker
(17)
Spring state indicator for circuit-breaker
(18)
CLOSED/OPEN indicator of the circuit-breaker
Actuating opening for opening the circuit-
(19)
breaker
Actuating opening for closing the circuit-
(20)
breaker
Rotary button to close and open the actuating
(21)
opening located below
NXAIR M
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

139-2021.9

Table of Contents